From: route@monster.com
Sent: Friday, April 15, 2016 10:21 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Kurtis Alan Kilponen 1151 County Road 43 Tyler, AL 36785 (334) 875-8470 kurtiskilponen@att.net Summary
of Qualifications
30 years of experience working with
various communications systems/suites. Additionally: QA/QC physical
Buildings, airfields, HAVC, Power/lighting, Mechanical, plumbing.
12 years Experience performing in Site Manager and Lead Positions or
working independently on installing and managing fiber optic and copper
cabling for Inside and Outside Plant.
5 years Experience as a Certified Field
Engineer for Tellabs.
3M Certified Fiber Optics Technician
US Navy (20 years) NEC 2313/2319/9502
8 years certified Phone Technician
Certified for Hubble Installation (for 15 year warranty)
Certified for Levition Category 5
Certified for Bay Networks, Basic TCIP/IP
Certified BICSI ITS Technician Employment
History:
Contract Consultant
IZ Technologies
March 2014 to Present
Duties: Assists with Planning, scheduling
For contracts.
Construction Consultant
Veteran of Foreign wars: Post 3016
Nov 2013 to present
Duties: Assists with business systems and
Repairs to building structures.
Network Systems Engineer I: Surveyor
Centech Group Inc.
Mar 1 2013 to OCT 2013
Duties: Inspect, Design and submit Both New and Ads, Moves
And changes to ISP/OSP Plants on Warner Robins AFB.
Additional Duties of QA/QC Engineer.
Cable Plant Maintenance Technician
Centech Group Inc.
Sep 3 2012 to Feb 28 2013
Duties: Maintained Fiber/Copper Cabling Plants on
Gunter AFB.
Cable Plant Maintenance Technician
General Dynamics
April 30 2012 to Sep 2 2012
Duties: Maintained Fiber/Copper Cabling Plants on
Gunter AFB.
Custom Protection Officer for G4S Secure Solutions
Selma Alabama
March 12, 2012 to Apr 29 2012
Duties: Providing armed security on a part-time basis.
Site Manager/Inside/Outside Plant /structural Plant
QA/QC Engineer – US Army/Mission1st
Southwest Asia/Washington DC
March 2008 –October 2011
Duties: Managed Sites in Iraq. Designed, managed and QA/QC communications
projects for DoD, DoS and OGA, to include: Structure, services, and End to
End communications, connectivity. Last assigned to Washington DC, as a
subject matter expert to advise Government Contracting officers (PEO PM P2E)
on above. Secret Clearance is
current.
Inside Plant Engineer/Installer/Certification – Ellis
Environmental Group
Maxwell Air Force Base – Alabama
Feb 2007 – Jan 2008
Duties: Engineering design of Communications Hubs, closets and
pathways. Installation to include: entire communications suite, to
include Racks, patch panels, switches, power supplies, Fiber optic and
Category 6 cabling. Certifications of inside/outside plant and Turnover to
customer.
Outside Plant Engineer – DRS/Tamsco
Baghdad Iraq
Dec 2004 - Sep 2006
Duties consisted of Site surveys, Proposals, Designs, Direction to
installers both American and Iraqi. Coordination of Right of way with
DoD/Dos, Iraqi Military/Government. Research and drafting of needed
equipment and install materials. Training of Iraqi installers to
TIA/EIA standards. Secondary functions: of installation and testing ISP/OSP
systems that were classified. Rehabilitation of existing Iraqi
ISP/OSP systems Damaged by wartime conditions.
Quality Assurance Engineer - General Dynamics
Oct 2002 to Nov 2004
Conducted inspections of subcontractor’s installations to insure compliance
with EIA / TIA, NEC Standards, Codes and OSHA rules. Trained and/or
Conducted evaluations of site managers, ISP/OSP Leads and subcontractors on
compliance with NMCI/BLII infrastructure program. Periodically served, as
both site Manager or as ISP/OSP lead technician. Implemented initial
designs and revised as needed designs of Cabling Plants. This Included all phases
of contract from initial design walk-through to final As-Built Verification. Duties Performed
Both Across U.S and Internationally.
Field Service Engineer -
Tellabs
May 1999 to Jan 2002
Certified as a Field Engineer for the 530/532/532L/5500 TITAN product Lines.
Duties included test and acceptance of new installation, troubleshooting,
repair and upgrading of older installations, worked nationally at various
facilities.
Contract Service Engineer - Butler
Communications for Tellabs
Sept 1998 to May 1999
The same Duties were performed as previous description.
Fiber Optic & Lead Cabling Technician –
Aerotek
Apr 1998 to Sep 1998
Assigned as a Technician to both: Lucent Technologies and Rancho Santa Fe.
This was for the installation of Category 5/3, Coaxial, fiber Optic cabling.
This included testing and certification.
Lead Cabling Technician - Telcom Data
Jul 1996 to Apr 1998
Assigned: site Management/Lead position. Working with other installers
or independently. Duties included: Pre-bids and design of cabling plants,
installation, testing/certification, troubleshooting/repair of all types of
phone/computer installations from Type 1 cabling to Fiber Optic Cabling.
Completed contracts included following companies: Pacific Bell, California
Dept of Corrections/Transportation.
Technical Support Representative - Home
Controls
Feb 1996 to June 1996
Technical Support for product lines designed for remote computer control of
offices and homes.
Sales Associate/Production Technician -
Things Remembered
Nov 1995 to July 1996
Communications System Controller/Technician
US Navy (Honorably Retired)
Nov 1975 to Nov 1995
Primary duties included: Systems Quality Control/RF Technician, monitoring,
maintaining all associated communications for Satellite, (CDMA/TDMA),
Microwave, HF/VHF/UHF/SHF/LF Suites and associated equipment.
Experience ranged from Fixed, Mobile, Ashore and Afloat Installations.
Secondary responsibility was sending, receiving and distribution of various
Voice/Record traffic. Education/Certifications
Chapman College
Selma High School Security
Clearance
Currently: SECRET
Held TOP SECRET during US Navy career |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|